A 20 m² production room at 30 % humidity: where its cooling load comes from
A 2026 conference paper designs and then measures the HVAC for a diagnostic-test production room. We rebuild its 30,436 Btu/h load and show that moisture, not heat, sets the plant.
Rapid diagnostic tests go soft if the air they are packed in is damp, so the room they are made in is held under 30 % relative humidity. A 2026 conference paper designs the air conditioning for one such room — 20.54 m² of floor, 2.8 m to the ceiling — then measures what it actually achieved over a month. The design numbers it prints are enough to rebuild the whole load from scratch, which is what the HVAC load tool does, and the answer is not what most people expect: for this room the moisture matters more than the heat. The air-state arithmetic behind it belongs to psychrometrics, and the wall and ceiling part to heat conduction solver.
The paper in brief
A user requirement specification set three targets: air under 26 °C, under 30 % RH, and 6 to 20 air changes per hour. The authors sized the plant against those, installed it, and then monitored the empty room for a month.
Their design numbers: a room cooling load of 30,436 Btu/h, a separate dehumidifier drawing 600 m³/h of process air and removing 4.314 kg of water per hour, whose regeneration heater adds 9000 W, giving a total thermal load of 61,162 Btu/h and a selected cooling unit of 85,846 Btu/h. The room holds four operators and four listed machines — a cutting machine (200 W), an assembly roller (100 W), a heat sealer (500 W) and a microwave (900 W).
Their verification: 19.93 air changes per hour from a measured total supply of 1146 m³/h, with the room sitting at 21 to 25.2 °C and 20 to 28 % RH over the month. Both are inside the specification, which is the paper’s headline claim.
Checked with the tools
Three of the paper’s chains of numbers can be rebuilt exactly, and the fourth — the room load itself — can be reconstructed once we say out loud what the paper leaves unsaid.
Step 1: the airflow and the air changes are self-consistent. Air changes per hour times room volume gives the supply airflow. With 57.5 m³: 6 × 57.5 = 345 m³/h and 20 × 57.5 = 1150 m³/h, exactly the range the paper derives. Going the other way, the measured 1146 m³/h divided by 57.5 m³ is 19.930 h⁻¹, the paper’s 19.93. That is 318.3 L/s, the number the tool’s Ventilation outdoor air (L/s) box wants.
Step 2: the psychrometrics are right to three figures. The paper dries air from 23 °C and 60 % RH down to 25 % RH. Running the same two states through the maths behind psychrometrics:
| Quantity | Paper | Tool’s maths |
|---|---|---|
| Saturation vapour pressure at 23 °C | about 28.1 hPa | 28.104 hPa |
| Absolute humidity at 23 °C, 60 % RH | 12.33 g/m³ | 12.337 g/m³ |
| Absolute humidity at 23 °C, 25 % RH | 5.14 g/m³ | 5.141 g/m³ |
| Difference | 7.19 g/m³ | 7.197 g/m³ |
| Water removed at 600 m³/h | 4.314 kg/h | 7.19 × 600 ÷ 1000 = 4.314 kg/h |
The moisture duty is an exact product of the paper’s own two numbers. Turning it into power: 4.314 kg/h at a latent heat of about 2544 kJ/kg at 23 °C is 3.05 kW, or 10,400 Btu/h of latent load that the room’s cooling coil never has to see, because the dehumidifier takes it.
Step 3: the total load is the room load plus the heater, and nothing else. The 9000 W regeneration heater is 30,709 Btu/h (the paper rounds it to 30,726). Added to the 30,436 Btu/h room load that gives 61,145 Btu/h against the paper’s stated 61,162 — a difference of 17 Btu/h, or 0.03 %, which is rounding. So the “total thermal load” is literally those two terms, and the 85,846 Btu/h unit is 40.4 % above it, the margin the paper quotes. Worth knowing, because it means the heater the dehumidifier needs is as big a load as the whole production room.
Step 4: how much of that 1146 m³/h can be outdoor air? Here the paper is silent, and this is where the tool earns its keep. We built the room in HVAC load: 20.54 m² of floor, 2.8 m high, held at 25 °C and 25 % RH, with the four machines (1700 W), four people at 75 W sensible and 55 W latent each, 10 W/m² of lighting, and a light insulated shell against a 32 °C, 70 % RH outdoor design state. The envelope, the outdoor state and the people and lighting figures are our assumptions; the room size, the airflow and the machine powers are the paper’s. Then we swept the outdoor-air share of the supply from nothing to everything.
If all 1146 m³/h were outdoor air, the load would be 67,600 Btu/h — more than twice what the paper reports, with 51,000 Btu/h of it latent. The paper’s 30,436 Btu/h is matched at about 36 to 37 % outdoor air, roughly 420 m³/h or 118 L/s, the rest recirculated. At that point the tool splits the load as 11,400 Btu/h sensible and 19,400 Btu/h latent, a sensible heat ratio of 0.37: nearly two thirds of the duty is drying the air. For comparison, the machines contribute 5800 Btu/h and the whole envelope only about 800.
That is the engineering lesson of the paper restated in numbers it does not print. A room like this is a dehumidification problem wearing a cooling problem’s clothes, which is exactly why the authors bought a separate 4.5 kg/h dehumidifier rather than a larger chiller.
Step 5: what the humidity target costs. Holding the same room at 30 % RH instead of 25 % drops the load from 30,700 to 29,600 Btu/h; letting it drift to a normal office 50 % drops it to 25,000. Figure 2 shows the curve. The sensible part barely moves; all of the change is latent.
How we made the graphs
Both charts and every number above come from scripts/blog-figures/cleanroom-production-room-cooling-load-sensible-latent-check.mjs in fibub’s public code. It calls roomLoad from src/lib/sci/hvacload.ts (fabric U·A·ΔT, outdoor air sensible and latent from the humidity ratios, people, lighting and equipment), the maths behind HVAC load, and pws and air from src/lib/sci/psychro.ts, the maths behind psychrometrics.
From the paper: the floor area, ceiling height and volume, the 6 to 20 air changes, the measured 1146 m³/h, the room and total loads, the heater power, the dehumidifier’s 600 m³/h and 4.314 kg/h, the two air states and the four machine powers. Our assumptions: the 32 °C and 70 % RH outdoor design state, the atmospheric pressure at 700 m, the partition and ceiling areas and U-values (0.5 and 0.4 W/m²K), 75 W sensible and 55 W latent per person, 10 W/m² of lighting, a 25 °C room and no safety margin. Step 4 is a reconstruction, not the paper’s calculation.
How we test the maths
tests/sci-tools/hvac-room-load.mjs runs inside tests/sci.mjs on every change to fibub:
- A made-up room’s fabric load must equal the hand sum of U·A·ΔT term by term, and its solar gain the hand product of area, SHGC and irradiance.
- The outdoor-air sensible and latent loads must match an independent evaluation of the psychrometric humidity ratios at the stated pressure, and the unit conversions must satisfy 1 W = 3.412141633 Btu/h and 1 ton = 3516.852842 W.
- The psychrometrics themselves are pinned in
tests/sci-tools/psychrometric-calculator.mjsagainst published ASHRAE table values. - New with this article: the paper’s two air states must give 28.1044 hPa, 12.3373 g/m³ and 5.1405 g/m³, so that 7.19 g/m³ over 600 m³/h returns 4.314 kg/h; and the reconstructed room at 424.02 m³/h of outdoor air must give 11,355 Btu/h sensible, 19,364 Btu/h latent and a sensible heat ratio of 0.370.
Check it yourself
On the HVAC load tool page:
- In Room and design conditions, set Floor area (m²) to 20.54, Ceiling height (m) to 2.8 and Altitude (m above sea level) to 700.
- Set Cooling: inside (°C) to 25, Cooling: inside humidity (% RH) to 25, Cooling: outside design (°C) to 32 and Cooling: outside humidity (% RH) to 70. Leave the heating row alone; this room never needs heat.
- In Walls, windows and roof, replace the example with two lines: Partition walls and door, 50.74, 0.5 and Ceiling, 20.54, 0.4.
- In Outdoor air and internal gains, set Infiltration (air changes per hour) to 0, Ventilation outdoor air (L/s) to 117.8, People to 4, Equipment (W) to 1700, Lighting (W/m² of floor) to 10 and Safety margin (%) to 0.
- Peak loads shows a cooling total near 9.0 kW (30,700 Btu/h), split about 11,400 Btu/h sensible and 19,400 Btu/h latent, with a sensible heat ratio of 0.37. The breakdown table puts Outdoor air at about 21,600 Btu/h of that and Equipment at 5800.
- Now type 318.3 into Ventilation outdoor air (L/s) — the full measured supply as outdoor air — and the total jumps past 67,000 Btu/h. Put it back to 117.8 and raise Cooling: inside humidity (% RH) to 50 to watch the load fall to about 25,000.
What researchers can use it for
- Back out an unstated assumption. A paper that gives a load but not its outdoor-air fraction can be inverted, as in Step 4, by sweeping the one unknown until the published number appears.
- Check an air-change specification against a real airflow before trusting it: volume times air changes, both ways, in one line.
- See whether a room is sensible- or latent-driven from the sensible heat ratio, which decides between a bigger coil and a separate dehumidifier.
- Price a humidity target for a clean or controlled space by sweeping the setpoint, as in Figure 2, before it is written into a specification.
- Sanity-check a layered wall or ceiling U-value with heat conduction solver, then feed it straight into the element list here.
The fine print
- Step 4 is our reconstruction, not the paper’s calculation. The paper does not publish its envelope, its outdoor design state, its people or lighting gains, or its outdoor-air fraction, so the 36 to 37 % is the share that reproduces its stated load under our assumptions, and a different envelope would move it.
- The tool is a steady-state estimate: no thermal mass, no time lag, no hour-by-hour sun, no diversity. The paper used a commercial hourly program, so small differences are expected.
- Cleanroom air changes are driven by particle removal and room pressurisation, not comfort. Treating the whole supply as outdoor air, as in Step 4’s right-hand edge, is a worst case, not a design.
- The paper’s own text is inconsistent in places (the dehumidifier’s start state is quoted at 23 °C while the room runs nearer 25 °C), so the moisture duty in Step 2 is an upper figure.
- For study and planning. A real controlled-environment room needs a qualified engineer and a validated calculation.
Sources
- Kusaeri, R., Mitrakusuma, W. H. and Pamungkas, R. (2026), Digitally assisted HVAC design and performance verification for a rapid diagnostic test production room, E3S Web of Conferences 754: 03002 (ISSAT 2026), doi:10.1051/e3sconf/202675403002. Licence CC BY 4.0, checked on the EDP Sciences article PDF, 2026-11-24. Values used here: floor area 20.54 m², ceiling height 2.8 m, room volume about 57.5 m³; user requirement specification under 26 °C, under 30 % RH, 6 to 20 air changes per hour; derived supply range 345 to 1150 m³/h; measured 19.93 air changes per hour and 1146 m³/h total supply; room cooling load 30,436 Btu/h; dehumidifier heater 9000 W (30,726 Btu/h); total thermal load 61,162 Btu/h; selected cooling unit 85,846 Btu/h (about 40.4 % margin); dehumidifier process air 600 m³/h, moisture removal 4.314 kg/h, absolute humidity 12.33 g/m³ at 23 °C and 60 % RH falling to 5.14 g/m³ at 25 % RH, a change of 7.19 g/m³, saturation vapour pressure at 23 °C about 28.1 hPa; four operators; cutting machine 200 W, assembly roller 100 W, heat sealer 500 W, microwave 900 W; one month of at-rest monitoring at 21 to 25.2 °C and 20 to 28 % RH.
- Saturation vapour pressure and humidity ratios: ASHRAE Handbook of Fundamentals formulation for water vapour over liquid water, as used in src/lib/sci/psychro.ts (general formula).
If you are an author or publisher and want a credit or a passage changed or removed, tell us and we will act quickly.