One term carries 95 % of a reference filter's uncertainty budget
A 2025 metrology paper publishes the full uncertainty budget of three absorbance reference filters. We rebuild it in fibub's GUM calculator: the one-year stability term is the whole story.
A spectrophotometer that measures how much light a sample absorbs is only as good as the filter used to check it. A 2025 paper from the International Metrology Congress characterises three plastic reference filters on a primary spectrophotometric system and, unusually, prints its whole uncertainty budget: five influences, in absorbance units, for each filter. That makes it a rare worked example anyone can rebuild, and a good test of the uncertainty propagation calculator, which follows the GUM and adds a Monte Carlo check. If you are using such a filter to set up a method, the calibration curve and Beer–Lambert calculator are the next two steps, and the control charts tool watches the drift this paper is really about.
The paper in brief
The filters are plastic films used to calibrate nano-volume spectrophotometers, the kind that read a one- or two-microlitre drop. The authors measure their spectral absorbance on a primary system — xenon flash lamp, single monochromator, double split beam, semiconductor detector, 190 to 1100 nm — and then list what limits the value they can certify.
Their budget has five entries per filter: the spectrophotometric system itself (dispersion, drift, stray light, resolution, wavelength setting), bundled as 0.00104 absorbance for all three; the one-year stability of the filter, 0.0104 to 0.0173; homogeneity across the filter’s area; the effect of exposure to light; and temperature. The combined standard uncertainties come out at 0.0106, 0.0115 and 0.0177 absorbance, and the expanded uncertainties at k = 2 are 0.0213, 0.0231 and 0.0356.
Checked with the tools
The Uncertainty propagation calculator takes a formula and a list of measured quantities with their uncertainties. A budget of this shape is written as the certified value plus one zero-valued correction per influence, so we typed A = 0.5 + sys + stab + homo + light + temp, with each correction at zero and the paper’s value as its standard uncertainty. The 0.5 is an illustrative certified absorbance (ours: the paper’s certified values were not in the text we could read). Because every term adds, the sensitivity coefficients are all exactly 1 and the result does not depend on that 0.5 at all.
The budget checks out. Combining all five terms in quadrature reproduces each of the paper’s combined uncertainties, and doubling them gives its expanded uncertainties:
| Filter | Paper’s uᶜ | Tool’s uᶜ | Paper’s U (k = 2) | Tool’s U at 95.45 % |
|---|---|---|---|---|
| FOL1 | 0.0106 | 0.010614 | 0.0213 | 0.021228 (k = 2.000) |
| FOL2 | 0.0115 | 0.011557 | 0.0231 | 0.023115 (k = 2.000) |
| FOL3 | 0.0177 | 0.017783 | 0.0356 | 0.035566 (k = 2.000) |
Two small things worth saying out loud. First, the paper’s uᶜ values are its own numbers rounded down rather than to nearest (0.011557 printed as 0.0115), which is why its expanded values are not exactly twice them. Second, the tool’s coverage factor comes out as exactly 2.000 at 95.45 % coverage because every input here is a Type B estimate with no degrees of freedom attached; if even one term came from a handful of repeated readings, the Welch-Satterthwaite rule in the tool would push k above 2, and the paper’s k = 2 would be slightly optimistic. A Monte Carlo run of 200,000 draws agrees with the GUM result to four figures (standard deviation 0.010607 against 0.010614 for FOL1).
One term is the budget. The tool’s “Where the uncertainty comes from” table gives each influence’s share of the variance:
| Influence | FOL1 | FOL2 | FOL3 |
|---|---|---|---|
| One-year stability | 96.0 % | 90.6 % | 94.6 % |
| Temperature | 2.6 % | 0.0 % | 0.0 % |
| Spectrophotometric system | 1.0 % | 0.8 % | 0.3 % |
| Light exposure | 0.1 % | 5.9 % | 3.0 % |
| Homogeneity | 0.3 % | 2.7 % | 2.0 % |
Delete the other four terms entirely and uᶜ falls only from 0.010614 to 0.0104 for FOL1, from 0.011557 to 0.0110 for FOL2 and from 0.017783 to 0.0173 for FOL3: at most 4.8 %. Figure 2 sweeps the stability term and shows every filter sitting on the line where stability is the uncertainty; the other terms only start to matter below about 0.004 absorbance.
So what would actually improve the standard? The tool answers that by changing one line. Halving the stability term — in practice, certifying the filter every six months instead of every year, if drift grows with time — cuts uᶜ by 47 % (FOL1 0.010614 → 0.005615; FOL3 0.017783 → 0.00958). Nothing else comes close: a perfect thermostat, a perfect instrument and a perfectly uniform film together buy under 5 %.
| Check | What the tool gives |
|---|---|
| uᶜ from all five terms, FOL1 / FOL2 / FOL3 | 0.010614 / 0.011557 / 0.017783 |
| uᶜ from the stability term alone | 0.0104 / 0.0110 / 0.0173 |
| uᶜ with the stability term halved | 0.005615 / 0.006544 / 0.009580 |
| Coverage factor at 95.45 %, all Type B | k = 2.000 |
| Monte Carlo standard deviation, FOL1 | 0.010607 (GUM: 0.010614) |
| If the four Type B terms were ± half-widths, not 1-sigma | 0.010472 / 0.011189 / 0.017463 |
That last line matters because the paper does not say which of its entries are standard uncertainties and which are the half-widths of a range. We read all five as standard uncertainties. Treating the four small ones as rectangular half-widths instead (dividing by √3, which the tool does for you) changes uᶜ by 1.3 to 3.2 % — a reassuring answer, and one that only takes a change of the Kind dropdown to find.
How we made the graphs
Both charts and every number come from scripts/blog-figures/spectrophotometer-filter-uncertainty-budget.mjs in fibub’s public code. It uses exactly the pieces the tool page uses: splitName, parse, variables and compile from src/lib/sci/expr.ts for the formula, then propagate (GUM first-order propagation with numerical sensitivity coefficients, Welch-Satterthwaite degrees of freedom and a coverage factor from the t distribution) and monteCarlo (JCGM 101:2008, 200,000 draws, fixed seed) from src/lib/sci/uncertainty.ts.
Every uncertainty value comes from the paper’s budget tables. Our assumptions: the certified absorbance of 0.5 (which cancels), reading all five entries as standard uncertainties with no correlation between them, and the sweep in Figure 2 holding the other four terms at the paper’s values.
How we test the maths
On every change to fibub, tests/sci.mjs pins the GUM routine itself, and the new tests/sci-tools/uncertainty-calculator.mjs pins this paper’s budget:
- Ohm’s law, R = V/I with V = 5 ± 0.01 V and I = 0.2 ± 0.0005 A, must give R = 25 ohms with uᶜ = 0.08004 ohms and k = 2.0.
- The pendulum, g = 4 pi² L / T² with L = 1 m ± a 0.001 m half-width and five period readings (2.01, 2.00, 2.02, 1.99, 2.01 s), must give g = 9.81 m/s², uᶜ = 0.050 and U = 0.14 m/s², and the Monte Carlo interval must hold g and match U to within 10 %.
- New with this article: the paper’s three five-term budgets must give uᶜ = 0.010614, 0.011557 and 0.017783 absorbance and U = 0.021228, 0.023115 and 0.035566 at k = 2.000, with infinite effective degrees of freedom and every sensitivity coefficient equal to 1; the stability share must be 96.01 %, 90.59 % and 94.64 %; each filter’s budget must sit within 5 % of its stability term alone; halving that term must give 0.005615; reading the four small terms as rectangular half-widths must give 0.010472; and a 200,000-draw Monte Carlo run with the tool’s fixed seed must give 0.010607.
Check it yourself
On the uncertainty propagation calculator tool page:
- In What you calculate, type A = 0.5 + sys + stab + homo + light + temp. Five measurement rows appear.
- Leave every Value at 0 and every Kind on ± standard uncertainty. In the ± boxes type, for filter FOL1: 0.00104 (sys), 0.0104 (stab), 0.0006 (homo), 0.0004 (light), 0.0017 (temp).
- With Coverage on 95 % (2 sigma), the result reads A = 0.5000 ± 0.0212 with Standard uncertainty u 0.010614 and Coverage factor k 2.00.
- The Where the uncertainty comes from table puts stab at about 96 % of the variance and everything else in the noise. The Monte Carlo check gives a standard deviation of 0.01061.
- Change stab to 0.0052 and watch the standard uncertainty fall to 0.005615: halving one term halves the budget.
- Put the FOL3 column in instead (0.00104, 0.0173, 0.0025, 0.0031, 0.0001) and you get 0.017783 and an expanded 0.0356, the paper’s value for its worst filter.
What researchers can use it for
- Reproduce a published budget before you rely on its certificate: five numbers and a formula are enough (Uncertainty propagation calculator).
- Find the term worth spending money on. Here it is recalibration frequency, not thermostats (Uncertainty propagation calculator).
- Check a coverage factor. k = 2 is right only when the degrees of freedom are large; the tool works out the effective value for you.
- Test how much the unstated distributions matter, by switching entries between standard uncertainty, rectangular and triangular.
- Carry the filter’s uncertainty into a method: feed it to the calibration curve tool as the standard’s uncertainty, and watch the instrument’s own drift between checks with the control charts tool.
The fine print
- The uncertainty values are the paper’s; the certified absorbance of 0.5 is ours and cancels out of everything here.
- The paper does not state distributions or sensitivity coefficients. We read all entries as standard uncertainties with unit sensitivity, which reproduces its combined values, and show above what the alternative reading costs.
- We assume the five influences are independent. A correlation between, say, stability and light exposure would change the combined value, and the GUM has terms for that which this budget does not report.
- “Halving the stability term” is an illustration of the budget’s shape, not a claim about how these particular films drift.
- The paper is a conference article from a metrology congress; its budget is as printed and we did not re-measure anything.
Sources
- Zarubica, V., Kubicela, E., Zarkov, B. and Sreckovic, M. (2025), Metrological characterization of standards - plastic films, which are used for calibration of nano volume spectrophotometers, EPJ Web of Conferences 323: 10002 (22nd International Metrology Congress), doi:10.1051/epjconf/202532310002. Licence CC BY 4.0, quoted on the article PDF itself ('This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0'), checked 2026-11-24. Values used here, all in absorbance units: spectrophotometric system 0.00104 for all three filters; one-year stability 0.0104, 0.0110 and 0.0173; filter homogeneity 0.0006, 0.0019 and 0.0025; exposure to light 0.0004, 0.0028 and 0.0031; temperature 0.0017, 0.0002 and 0.0001; combined standard uncertainty 0.0106, 0.0115 and 0.0177; expanded uncertainty with k = 2 of 0.0213, 0.0231 and 0.0356. The primary system covers 190 to 1100 nm.
- Method: the GUM (JCGM 100:2008) for the combined standard uncertainty, effective degrees of freedom and coverage factor, and JCGM 101:2008 for the Monte Carlo check. Both are free from the BIPM.
If you are an author or publisher and want a credit or a passage changed or removed, tell us and we will act quickly.